Getting ready for a new sidewalk on the east end of the football field.
New east and west elementary entrance doors.
The summer crew assembling new desks.
New bathroom in SPED room.
Big changes in the SPED room.
Outside of FCS room, making a wall so that a freezer can go on the other side.
The freezer will go on this wall.
Big changes in Miss Anstine's room. The small rooms have been demolished making one big room with 1 small room.
Conference room added on the east side of Miss Anstine's room.