CPS

CPSGetting ready for a new sidewalk on the east end of the football field.

CPSNew east and west elementary entrance doors.

CPSThe summer crew assembling new desks.

CPSNew bathroom in SPED room.

CPSBig changes in the SPED room.

CPSOutside of FCS room, making a wall so that a freezer can go on the other side.

CPSThe freezer will go on this wall.

CPSBig changes in Miss Anstine's room. The small rooms have been demolished making one big room with 1 small room.

CPSConference room added on the east side of Miss Anstine's room.